PCRW IconPlanned Construction & Road Work

On this page you will find all the construction and road work going on around the Township. Please be advised that this page is updated once the project is completed. At times the dates that are provided can change with little notice and end dates may change due to project being delayed due to weather or other circumstances.

PennDot IconPennsylvania Department of Transportation

For a complete list of construction projects impacting state-owned highways in Bucks, Chester, Delaware, Montgomery, and Philadelphia counties, visit the District 6 Traffic Bulletin.

For access real-time road conditions and travel restrictions, visit 511PA.com or download the 511PA app.

Scheduled to begin Location(s) Scheduled to End Link
October 25, 2021 Lansdowne Avenue Lane Closure in Upper Darby, Haverford Townships, Lansdowne Borough October 29, 2021
  • More Information
  • PECO IconPECO
    Location(s) Project Details Link
    Upcoming Gas Main and Bare Steel Service Replacement

  • PECO has announced plans to continue replacing existing natural gas mains and related equipment throughout the region during 2022. This will include new underground pipe made of modern materials, which is more durable, enhances safety and improves service reliability. As part of this Bare Steel Service Replacement Program (BSSR), PECO will replace bare steel gas service lines with plastic due to risks associated with material age and degradation. This is part of PECO’s larger commitment to the Pennsylvania Public Utility Commission aimed at preventing future gas leaks and mitigating risk within the PECO Gas system. According to PECO, this work is critical to the safe and reliable gas service that we have grown to appreciate. PECO’s schedule for 2022 is particularly aggressive, and there will be additional gas main work for years to come.
  • For affected areas in Haverford Township Full PDF
  • PECO IconAQUA
    Scheduled to begin & Link Location(s) Construction complete Restoration
    Week of January 10, 2022 The week of January 10, 2022 Aqua Pennsylvania will begin the replacement of 3,233 feet of aging 6-and 8-inch water mains with new 6-and 8-inch ductile iron water mains on Parkside Drive from Forest Avenue to the end of the cul-de-sac by# 1448 Parkside Drive, Forest Avenue between Fairview Avenue and Parkside Drive, Bon Air Terrace between Forest Ave and Central Avenue, Central Avenue between Bon Air Terrace and Steel Road, Hillside Avenue from Steel Road to the end of the cul-de-sac by# 540 Hillside Ave in Haverford Township. Unknown restoration date
    Update Info Week of October 18, 2021 Aqua Pennsylvania will begin the replacement of 4,849 feet of aging 4-, 6-and 16-inch water mains with new 6-, 8-and 16-inch ductile iron water mains on West Chester Pike between Manoa Road and Township Line Road, Vernon Road from West Chester Pike to the end of the cul-de-sac by# 28 Vernon Road in Haverford Township. Unknown restoration date
    July 06, 2021 Aqua Water Main Repalace
  • Aqua PA will begin the replacement of 2,263 of aging 6- and 8- inch water mains on Steel Road between North Ormond and Greenview Lane.
  • Unknown date for completion Unknown restoration date
    June 14, 2021 Aqua Water Main Repalace Campbell Avenue between Saint Dennis Lane and Hastings Avenue | Hawthorne Avenue between Campbell Avenue and Edgehill Drive | Hastings Avenue between Hawthorne Avenue and Earlington Road | Academy Lane between Hastings Avenue and Hawthorne Avenue | Ridgeway Road between Hastings Avenue and Woodmere Way | Woodmere Way between Earlington Road and Mill Road | Winton Avenue, Colony Lane and Hampton Road between Edgehill Drive and Mill Road | Edgehill Drive between Hampton Road and Woodmere Way | Mill Road between Woodmere Way and Colony Lane Unknown date for completion Unknown restoration date